|
HAPCOAT |
*MIX RATIO:
BY WEIGHT
(PARTS B TO
100 PARTS A) |
POT LIFE
@ 25° C |
CURE TIME |
SERVICE TEMP
(°F) |
DESCRIPTION |
|
RIGID SURFACE COAT SYSTEMS |
|
3720 |
15 |
20-30 minutes
Tack up time 45-60 minutes |
Overnight @ room temp. |
200 |
White, machinable. Used with
plaster & hemp to make plastic faced/ plaster backed tools.
|
|
3721/7
**3721 LV/7 |
12 |
35-45 minutes
Tack up time 50-70 minutes |
Overnight @ room temp. |
275 |
Two viscosities
Three speeds
3721
Thick
3721 LV
Medium
|
3721/41
**3721 LV/41 |
12 |
25-30 minutes
Tack up time 45-60 minutes |
Overnight @ room temp. |
200 |
3721/44
**3721 LV/44 |
12 |
15-20 minutes
Tack up time 30-45 minutes |
Overnight @ room temp. |
225 |
|
3726/7 |
12 |
30 minutes
Tack up time 50-70 minutes |
Overnight @ room temp.
For best results, post cure 3 hrs @ 250° F |
300 |
High performance,
high thermal
conductivity
aluminum
surface coat.
Machina ble. |
|
3726/22 |
14 |
45-60 minutes
Tack up time 60-90 minutes |
24-36 hrs. @ room temp.
Post cure 4-6 hrs.
@ 225-250° F |
340 |
|
*** 3726/30 |
15 |
60-90 minutes
Tack up time 2-4 hours |
4 hrs. @ 125-150° F
+ 4 hrs. @ 225-250° F |
370 |
|
3726/41 |
12 |
25-30 minutes
Tack up time 45-60 minutes |
Overnight @ room temp. |
185 |
|
3726/44 |
12 |
15-20 minutes
Tack up time 30-45 minutes |
Overnight @ room temp. |
220 |
|
3727/7 |
5 |
20-40 minutes |
Overnight @ room temp. |
300 |
High performance
High strength
Steel Surface Coat
Machinable |
|
3727/22 |
6 |
2-4 hours |
24-36 hrs. @ room temp.
Post cure 4-6 hrs.
@ 225-250° F |
340 |
|
*** 3727/30 |
6 |
1-2 hours |
4 hrs. @ 125-150° F
+ 4 hrs. @ 225-250° F |
370 |
|
3727/41 |
5 |
20-30 minutes |
Overnight @ room temp. |
200 |
3727/44 |
9 |
60 minutes |
Overnight @ room temp. |
225 |
|
FLEXIBLE SURFACE COAT SYSTEMS |
|
597-599 |
75 |
35-45 minutes
Tack up time 45-60 minutes |
24 hrs. @ room temp. |
N/A |
597 - White 599 - Grey
90-95 Shore A
667 - White 669 - Grey
65 Shore D |
|
667-669 |
75 |
15-20 minutes
Tack up time 20-30 minutes |
16-24 hrs. @ room temp |
N/A |